LOT S8 PENTRIDGE VILLAGE - COBURG
Completed: 2010
GROSS FLOOR AREA
11,000m2
LEVELS
6
PROJECT COST
$40M
Pentridge Boulevard, Coburg.
5 storey and 1 basement level structure.
3, 4 and 5 day cycles were achieved for both vertical and horizontal concrete elements.
Project was completed 2010.
SCOPE OF WORKS:
• FORMWORK DESIGN, SUPPLY AND INSTALLATION
• PRECAST MANUFACTURE AND INSTALLATION
• REINFORCEMENT SUPPLY AND PLACEMENT
• POST TENSION DESIGN AND CONSTRUCT